Slab thickness shrunk upstairs downstairs flooring pierced the roof (Photo).
<p> upstairs tenants apartment decoration, the roof accidentally punctured two holes in the bedroom downstairs. .6th floor of a residential property owners north of Chiang Liang and downstairs, 5th Floor, Rao owners suspected slab thickness of your school is not enough, they measured the findings, should be 10 cm thick slab actually only 7.5 cm thick. .Second person to require developers to move rooms, but the developers and the construction side of payment because of the difference is no agreement, and things on hold. .</ P> <P> <P> <p> is the thickness of the original floor was punctured shrunk </ p> <p> "your home renovation is too brutal, and the floor is pierced. ."Mr Jiang in 2007 in a district north of Unit 2, 3, 2 to buy a set of over 110 square meters of hop houses, this year in August, his son arranged for the marriage room, and got workers began renovation. .Start soon, Mr. Chiang received a downstairs neighbor on the phone. .He rushed home and found a large pit two fists in concrete floor. .One looks down from the pit, you can see the downstairs bedroom with double bed. ."At first I thought it was the construction of the problem, to find water master for damages. ."Chiang said. .</ P> <p> but water master wronged: "I played so many years and hole drilling method is that, for the first time such a situation. ."Teacher talk, drill just crushed, I felt wrong, bring to a look, the floor has some light," I suspect that the thickness of the floor is not enough. ."</ P> <p> Chiang immediately take a ruler to measure thickness," 7.5 cm, was a bit thin, oh. ."Mr. Jiang to come immediately to the Property Management Department building construction drawings, drawings marked: cement floor should be 10 cm thick. .</ P> <p> exchange of building developers and construction owners are parties disagree </ p> <p> by the loss of two people who have found the developers consultations. .</ P> <p> Mr. Jiang began to insist that the check-out, but the developer did not agree. .Subsequently, the developer proposed reinforcement and repair, was Mr. Jiang refused. .</ P> <p> two days ago, Mr. Jiang gave developers specify a set of over 140 square meters of houses to be replaced, but the area has more than 20 square meters, to make up the difference. .</ P> <p> developers believe that the slab thickness does not meet the construction requirements of the drawings, is the construction side of the construction issues. .After repeated consultations, parties agreed to undertake the construction of the house most of the difference. .</ P> <p> Unexpectedly, the developers and the construction side because of payment problems, things once again put on hold. .Construction project hopes paragraph by way of deduction to pay the difference, but developers have insisted on paying cash. .</ P> <p> Chiang that developers and contractors to buck-passing, not the responsibility. .</ P> <p> developers Manager He said the company manager is also coordinating the matter, the same time, the company will also be renovated 5th floor ceiling. .</ P> <p> extension >>></ p> <p> only a partial thickness of the slab is not enough </ p> <p> construction side Response: No quality engineering </ p> <p> the .responsible person Xiongfei Lan project construction in the telephone interview, said Mr. Jiang of the house floor, is only a partial thickness enough. .She admitted that she was, they just took over the project, cement, steel and other building materials is increasing in price, the project did not make money. .</ P> <p> Xiongfei Lan said, after they measured the thickness of the part to be pierced should be 8.5 cm, while the thickness of the floor of the project design standards, is indeed 10 cm. .She stressed: "basically reached the standard, only a partial thickness is not enough, so there is no quality problems. ."</ P> <p> experts say that standard: the standard slab thickness varies </ p> <p> Chengdu, a civil engineer construction units Deng Tiansheng introduced, in accordance with the" Concrete Structures for Construction Quality Acceptance ", the Housing slab thickness .should be within 8 cm -12 cm, and in fact, due to building design and construction standards for different types of materials together with the floor, capacity size, structure type, method, and other supporting factors, in many domestic .different regions, or even a different "local standards." .</ P> <p> the thickness of concrete slab houses and there is no fixed standard, only a design specification. .</ P>.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment