DIY home to have enough time, the necessary funds and enduring patience. DIY decoration, but also have that hand tools and the heart of the material. At the beginning of the design, it's a good idea to get some design books for reference, and inventory accumulation of the day, if I could come in handy.
Tile laying
Good question before handling paving tiles wall or the ground, and paving the way to define the row of brick, if there is a belt of directional pattern, direction paving products according to diagram. Pre-shop front, in the handling of ground, two mutually perpendicular lines and horizontal ruler leveling, wall vertical spindle with a hammer.
Pavement, press Division of the brick body size and good lines lime seams are reserved. Paving process with sticky mud bricks on leveling and seamless filler. In the wall should be repeated to hammer handle gently tap tiles that can firmly bonded. 1 hour later, the stones should be left in the brick surface of cement or other adhesive dirt wipes clean; 12 hours after paving, should be checked, percussion wall to free drum should be paving.
Floor laying
Because not professional decoration, floor preferably select snap to ease of laying the floor. In flooring, floor cloth should be placed within 48 hours, so that it fits the "local" temperature.
Ground requires flat, dry, clean, bump Department to get flat. Door and ground to set aside 2.5 ~ 3 cm of space. Pavement before laying bare ground layer of special plastic film that protects the floor against rising moisture damage.
In fact, DIY renovation involved, not only include material selection, painted walls, flooring and other large items, including furniture, matching, wallpapers and other small trimming of the application. Brains, relax, replacement sleeves, believes he can do better.
Wall of brushing
Walls before the paint would grant PuTTY or wall lining, etc, in leveling screed materials material drying, sanding dust formation, will float. Old paint walls it is best to clean the old paint, cleaning agent is not clear, apply to oil, used by agents in addition to the mould stain removal, and then rinse with clean, dry painted walls.
Construction before drums latex paint mixing, construction in temperature 5 ° c above, the relative humidity of 85%. When not to paint, if the direction is up and brush, from beginning to end, under the direction of the above, such as brushes, for left and right. Only when the orientation, colour is complete without a trace.
No comments:
Post a Comment