First, from a talk with decoration disputes

A unit of the Office of the present wanted to decorate a new reception customer, no tender only in the construction of additional items on the effect of price and construction disputes, construction of groundings. Journalists in decoration locations see, two days after the rainy weather, decorate a new wall was cloudy and wet a new Cabinet, below does not fully correspond with the ground, slit width can plug into a finger. Owners Mr. Zhang holding design effects pictures, design on the window and wall was in a plane, but the construction of the wall effect is the apparent width of a block.

He said that the construction budget for the entire project cost $ 6 million, and the project items that will increase the price of $ 1 million, including two about 1 m high Cabinet asking price $ 2800 and decoration company is not in accordance with the agreed to give a price details, which make them difficult to accept.

Because these details are not satisfied, in addition to the project item price increase in consultations, they repeatedly try to contact the renovation contract signature of another party, a member of the family name of the designer, but the hole repeatedly call their phone had no answer, decoration company saying that the designers have been transferred out of Jinan. Mr. Zhang said, after the contract was signed, the designers have no dew, now the design of construction results and a significant difference, but no designer to make a reasonable explanation.

To this end, the decoration company of Wu Manager said, this hole designers is not their company's employees. Since the company's employees, that can represent the company signed a contract with the customer? NG Manager said that they were the relations of cooperation.

Effect for construction, design and supervision of Mr. Liu said specific construction in accordance with the construction plans, rather than design renderings. But this explanation let Mr. Zhang convincing, given that the design effects on, why not truthfully drawing? he thinks, as non-professionals, owners are often concerned with the design, not to understand construction drawings.

Decoration industry norm — from design and construction

One had done in the decoration company designers Chen, decoration design and construction of touch is a universal phenomenon, designers in the design is completely after you finish drawing to the construction team, do not assume the responsibility of supervision, construction results often let owners disappointed.

In addition, owners will generally be 5% of the engineering section-10 per cent as a quality guarantee, at the completion of a period of time to pay, but this part often disappeared into obscurity. In fact, decoration companies in the budget have put this amount added to the first stage and second-stage payment, this decoration company, the master project there is a need to increase the project, feel free to expensive phenomenon is not surprising.